Twin Long Centered — 20 ft standard DC block

Two long pairs on either side of one PCS & MV skid — one skid feeds all four DC blocks

Overview

Two long pairs, each two DC blocks joined on their blind long sides. One PCS & MV skid (20 ft or 40 ft) sits between them, cable ends facing the skid.

PCS & MV skid
Twin Long Centered — cable ends facing the central skid
ParameterValue
DC blocks4 × 20 ft
PCS & MV skids1 × 20 ft / 40 ft
Section size30.3 × 5.1 m (99.4 × 16.7 ft)

Energy capacity

Section energy and power rating for this configuration.

DC blockBESS section (4 blocks)Duration
6.25 MWh25 MWh / 6.25 MW4h

Clearance and spacing defaults

Service clearance and spacing used by default. All values are adjustable in BESSLayout.

SettingDefault
DC block door side3.5 m (11.5 ft)
DC block cable end2 m (6.6 ft)
PCS & MV skid3 m (9.8 ft) all sides
DC block stacking gap0.2 m (0.7 ft)
Fire separation (between DC blocks of different sections)5 m (16.4 ft)

Cable layout

DC cables run from each long pair's cable end to the central PCS & MV skid.

Single BESS section footprint

Land area at default clearance. When cable ends face the skid, their clearance zones overlap with the skid zone — no extra width needed.

Cable ends facing the skid

Cable-end clearance shared with skid zone

366 m²(3,940 ft²)
30.3 × 12.1 m
99.4 × 39.6 ft
Cable ends facing outward

Cable-end clearance extends outward

414 m²(4,460 ft²)
34.3 × 12.1 m
112.6 × 39.6 ft
Land useCable inwardCable outward
Footprint30.3 × 12.1 m (99.4 × 39.6 ft)34.3 × 12.1 m (112.6 × 39.6 ft)
Total area366 m² (3,940 ft²)414 m² (4,460 ft²)

Multiple BESS sections footprint

Land area for four sections, in a row and in a 2 × 2 grid, at the default spacing.

Clearance
4 × 1 grid

4 sections · 16 DC blocks

1645 m²(17,708 ft²)
136.2 × 12.1 m
447.0 × 39.6 ft
2 × 2 grid

4 sections · 16 DC blocks

1454 m²(15,646 ft²)
65.6 × 22.2 m
215.3 × 72.7 ft